
Crane and Rigging Services
Request a quote for Crane and Rigging Services
Request a site walkthrough before your next rigging job in Woodstock.

Crane and Rigging Services
A machinery move or steel lift on a Woodstock site needs more than a crane truck — it needs a rigging crew that checks ground conditions, load weight, and overhead clearance before the lift starts.
How it works
Step 01
Site & Ground Assessment
The crew checks ground bearing capacity, overhead lines, and swing radius at the Woodstock site before the crane arrives.
Step 02
Load & Rigging Calculation
Load weight, centre of gravity, and attachment points are confirmed, then slings, shackles, and spreader bars are matched to the load.
Step 03
Crane Set-Up
Outriggers are positioned on cribbing or mats based on the ground assessment, and the crane is set at the planned position.
Step 04
Lift & Placement
The load is lifted and set using a signal person and tag lines to control swing in tight site conditions.
Request a site walkthrough before your next rigging job in Woodstock.
Questions about this service
What is the 3-3-3 rule for crane rigging on a Woodstock job site?
The 3-3-3 rule is a ground-bearing guideline that checks outrigger pad size, ground pressure, and swing-path clearance before a crew sets a crane. On a Woodstock site, the crew uses it to confirm cribbing and mat placement on soft or uneven ground before any load is lifted.
What does a rigging crew check before a machinery move?
A rigging crew confirms the load weight, centre of gravity, and attachment points, then matches slings, shackles, and spreader bars to that load. This walkthrough happens on site before the crane arrives, so the lift plan matches the actual machine.
What site access do you need to bring a crane into a Woodstock lot?
A rough-terrain or all-terrain crane needs a cleared path wide enough for the crane body plus clearance for the boom's swing radius, and solid or matted ground for the outriggers. The crew walks the route with the site contact ahead of the lift to confirm gates, overhead lines, and turning space.
Do you provide a lift plan before the rigging work starts?
Yes, a lift plan is worked out before the crew mobilizes, covering crane position, rigging hardware, and the lift sequence. It's reviewed against that site's ground conditions and any overhead obstructions.
Can your rigging crew move machinery inside a plant with low clearance?
Rigging and machinery moving inside a plant is handled with lower-profile equipment, such as carry deck cranes or skates, where boom clearance is limited. The crew checks door openings, floor load limits, and aisle width before choosing a lift method.
What equipment goes with the crane on a rigging job?
A rigging job typically brings slings, shackles, spreader bars, tag lines, and cribbing or mats for the outriggers, matched to the load being lifted. The exact hardware is selected after the load weight and attachment points are confirmed on site.
Request a Quote
Request a site walkthrough before your next rigging job in Woodstock.
Request a quote for Crane and Rigging Services
Request a site walkthrough before your next rigging job in Woodstock.